4 sonuçlar
Arama Sonuçları
Listeleniyor 1 - 4 / 4
Yayın Minimization of rest mismatches in round robin tournaments(Pergamon-Elsevier Science Ltd, 2018-11-01) Atan, Sabri Tankut; Çavdaroğlu, BurakIn sports tournaments, an occurrence of a difference in the rest periods of opponent teams in a game, which we refer to as a rest mismatch, will disadvantage the less rested team. Thus, it is only fair to expect opposing teams to have rested equally before their game. In this work, we introduce and study the Rest Mismatch Problem where the goal is to minimize the number of rest mismatches in a round robin tournament. Two integer linear formulations and a constraint programming formulation are provided, and their computational performances are compared for several problem instances. Moreover, a heuristic algorithm is developed which finds a single round robin schedule with zero mismatches when the number of teams in the tournament is a multiple of 8, and four mismatches when it is a multiple of 4 but not 8.Yayın Simultaneous scheduling of football games and referees using Turkish league data(Blackwell Publishing Ltd, 2017-05) Atan, Sabri Tankut; Hüseyinoğlu, Olgu PelinAssignment decisions of referees to football (soccer) games are highly debated in sports media. Referee assignments are typically done on a weekly basis as the league progresses. However, this practice ignores important workload constraints on referees. Moreover, referees' skill levels should also be considered in determining their assignments. In this article, we first give a mixed integer linear program formulation for the problem of simultaneously generating a game schedule and assigning main referees to games by incorporating specific rules in the Turkish league. We also approach this problem using a genetic algorithm (GA) because of the computational difficulties in solving the problem. In the GA solution pool, we suggest using templates for referee assignments that follow several referee-related workload constraints. We explain how these templates can be obtained by solving a mixed integer linear model prior to running the GA. The usage of these templates for referee assignments is conceptually similar to using a basic match schedule for game scheduling such as the one used in the Turkish Football League. We use the Turkish Football League fixtures for 2010–2013 as a case study. Experiments with the GA using real-world data show a rather modest performance in terms of computation time and objective function value. Our numerical results indicate that the problem is extremely hard to solve.Yayın Optimal project duration for resource leveling(Elsevier Science BV, 2018-04-16) Atan, Sabri Tankut; Eren, ElifResource leveling is important in project management as resource fluctuations are costly and undesired. Typically, schedules with better resource profiles are obtained by shifting the activities within their float times using the schedule of fixed duration found by Critical Path Method. However, if the project duration can be extended, it is plausible to find a schedule with enhanced resource leveling since a longer duration allows for more float time for all activities. In this work, we relax the assumption of fixed durations in resource leveling formulations and investigate what the minimal project duration for the best leveled schedule should be. We provide mixed-integer linear models for several leveling objectives including the Release and Rehire metric. We show that not all metrics used for leveling under fixed durations may be appropriate when the project duration becomes a decision variable. Optimal solutions from smaller problems are used to find the magnitude of the extension needed and benefits obtained thereby. Since the problem is a NP-hard problem for which exact solutions cannot be obtained for large networks in reasonable time, we provide a greedy heuristic to be used with the Release and Rehire metric. Using an iterative framework, we also test the performance of a state-of-the-art heuristic algorithm from the literature on our problem. Computational experiments indicate that the more the number of resources is increased, the less leveling benefits are gained from extending the project. The optimal project durations and extension benefits can also be significantly different for different metrics.Yayın Re-mining item associations: Methodology and a case study in apparel retailing(Elsevier Science BV, 2011-12) Demiriz, Ayhan; Ertek, Gürdal; Atan, Sabri Tankut; Kula, UfukAssociation mining is the conventional data mining technique for analyzing market basket data and it reveals the positive and negative associations between items. While being an integral part of transaction data, pricing and time information have not been integrated into market basket analysis in earlier studies. This paper proposes a new approach to mine price, time and domain related attributes through re-mining of association mining results. The underlying factors behind positive and negative relationships can be characterized and described through this second data mining stage. The applicability of the methodology is demonstrated through the analysis of data coming from a large apparel retail chain, and its algorithmic complexity is analyzed in comparison to the existing techniques.












