7 sonuçlar
Arama Sonuçları
Listeleniyor 1 - 7 / 7
Yayın The state of property development in Turkey: facts and comparisons(Cambridge University Press, 2016-09-01) Demiralp, Seda; Demiralp, Selva; Gümüş, İnciIn this article, we investigate economic and political developments in Turkey's construction sector over the last decade and consider their implications. We find that during the first term of the government of the Justice and Development Party (Adalet ve Kalklnma Partisi, AKP), thanks to administrative and economic incentives, both private and public construction rose considerably. Despite the construction sector's contribution to growth, there is also evidence of a transfer from the industrial sector toward the construction sector, which led to significant decline in the trend growth of the industrial sector in the era prior to 2006. Such evidence disappears in the post-crisis period, when the growth of private construction slows. However, overcentralization, clientelism, an absence of transparency, and limitations on citizen participation in urban planning remain as problems that need to be addressed through urban reform.Yayın How do local actors interpret, enact and contest policy? An analysis of local government responses to meeting the needs of Syrian refugees in Turkey(Routledge, 2022-05-04) Lowndes, Vivien; Karakaya Polat, RabiaAlthough 98% of Turkey’s 3.6 million Syrian refugees live outside camps, municipalities lack formal authority to initiate policies, while receiving no government funding for refugees. Drawing on interpretive policy analysis (IPA), the article unpacks the empirical puzzle of how formally weak local governments respond to refugee needs. IPA expects policy to be constituted through diverse sets of local meanings. Case studies in three districts in Istanbul revealed distinctive local narratives, some of which consolidated the national agenda of ‘hospitality’ while others focused on equal rights and integration. Municipal narratives reflected particular local contexts, selectively mobilizing deeper governing traditions. Local interpretations were enacted in specific approaches to refugee service delivery. Working with local NGOs, municipalities accessed international funds, despite national government’s vociferous critique of EU refugee policy. Even in an increasingly authoritarian setting, refugee policy was being constituted through multiple and contingent processes of local government interpretation.Yayın TRopBank: Turkish PropBank V2.0(European Language Resources Association (ELRA), 2020-05-16) Kara, Neslihan; Aslan, Deniz Baran; Marşan, Büşra; Bakay, Özge; Ak, Koray; Yıldız, Olcay TanerIn this paper, we present and explain TRopBank “Turkish PropBank v2.0”. PropBank is a hand-annotated corpus of propositions which is used to obtain the predicate-argument information of a language. Predicate-argument information of a language can help understand semantic roles of arguments. “Turkish PropBank v2.0”, unlike PropBank v1.0, has a much more extensive list of Turkish verbs, with 17.673 verbs in total.Yayın Hopf-cyclic cohomology of the Connes-Moscovici Hopf algebras with infinite dimensional coefficients(Springer Heidelberg, 2018-12-01) Rangipour, Bahram; Sütlü, Serkan Selçuk; Aliabadi, F. YazdaniWe discuss a new strategy for the computation of the Hopf-cyclic cohomology of the Connes-Moscovici Hopf algebra Hn. More precisely, we introduce a multiplicative structure on the Hopf-cyclic complex of Hn, and we show that the van Est type characteristic homomorphism from the Hopf-cyclic complex of Hn to the Gelfand-Fuks cohomology of the Lie algebra Wn of formal vector fields on Rn respects this multiplicative structure. We then illustrate the machinery for n = 1.Yayın Coordination in building an observatory: A case study of Eastern Anatolian Observatory (DAG)(SPIE-Int Soc Optical Engineering, 2018) Şahmalı, Ali Erkan; Yeşilyaprak, Cahit; Keskin, OnurEastern Anatolian Observatory (DAG) is designed to build on one of the summits of Palandoken Mountains in Erzurum, Turkey, at an altitude of 3,151 meters. The building is under construction since 2015 and expected to be completed in 2020. The building is designed as an integrated building, having operational departments, services, mechanical and electrical infrastructure for observations as well as cleaning and coating units, adjacent to the main observatory building. As one might expect this integration creates serious coordination problems between architect, engineers, telescope, enclosure, and cleaning & coating unit manufacturers. The construction progress of the investment is almost 20%. There are quite an amount of "lessons learned" in this period, and need to be developed by the parties, for their existing and future works. The building has so many challenges such as geological and geographical limitations, environmental and meteorological constraints, engineering and structural considerations, energy efficiency and sustainability, materials used and their performances at these limitations.Yayın A decision making support tool for selecting green building certification credits based on project delivery attributes(Pergamon-Elsevier Science Ltd, 2017-12) Seyis Kazazoğlu, Senem; Ergen Pehlevan, EsinThe Green Building (GB) certification process embodies detailed requirements and specifications that lead to additional tasks for project teams, which increases complexity levels of the entire project delivery process. Previous studies show that if the GB certification credits to be fulfilled are selected without considering project team attributes, then elevated levels of time, money, and labor could get wasted while attempting to meet the additional requirements of GB certification. The aim of this study is to develop a multi-attribute decision making (MADM) support tool to be used by GB experts to select the appropriate GB certification credits based on the project team attributes. The developed framework with relative weights assigned via the Delphi method was used to perform the MADM analysis, which employs the hybrid use of the Multi Attribute Utility Technique (MAUT) and the Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS). This paper presents the developed MADM tool (i.e., GB-CS tool) and the relative weights of the attributes that were determined following expert opinions. To validate the tool, a case study was conducted at a LEED-registered residential project. The results show that the GB-CS Tool was successful in ranking the GB certification credits to be selected. This hybrid MADM tool can be used for preventing disruptions and bottlenecks in GB project delivery processes by assisting the owners/GB consultants in effectively selecting suitable GB certification credits based on the project team attributes. Thus, with the assistance of the GB-CS tool, root causes of waste can be mitigated in the GB project delivery process, decreasing associated hidden costs.Yayın Analysis of the benefits, challenges and risks for the integrated use of BIM, RFID and WSN: a mixed method research(Emerald Group Publishing Ltd, 2023-07-11) Seyis, Senem; Sönmez, Alperen MertPurpose The purpose of this study is to identify, classify and prioritize the benefits, challenges and risks for the integrated use of building information modeling (BIM), radio frequency identification (RFID) and wireless sensor network (WSN) in the architecture, engineering, construction and operation (AECO) industry. Design/methodology/approach This study relies on the mixed method approach which consists of systematic literature review, semistructured interviews and Delphi technique. A systematic literature review was performed and face-to-face semistructured interviews with seven subject matter experts (SMEs) were conducted for identification and classification purposes. Delphi method was applied in two structured rounds with eleven SMEs for prioritization purpose. These three research techniques were chosen to reach the most accurate data by combining different perspectives on the subject matter. Data gathered by these three methods was triangulated to increase the validity and reliability of this research. Findings Thirteen benefits, ten challenges and four risks for the integrated use of BIM, RFID and WSN were identified. The results could aid the practitioners and researchers comprehend the pros and cons of this integration by representing SMEs' valuable insights and perspectives about the current and future status, trends, limitations and requirements of the AECO industry. The identified risks and challenges show the requirements for future studies while the benefits demonstrate the capabilities and the potential contributions of this hybrid integration to the AECO industry. Originality/value The integration of BIM, RFID and WSN is still not commonly implemented in the AECO industry. Some studies focused on this topic; however, none of them reveals the benefits, risks and challenges for integrating BIM, RFID and WSN in a holistic manner. This research makes a significant contribution to the AECO literature and industry by uncovering the benefits, challenges and risks for the integrated use of BIM, RFID and WSN that could increase industry applications.












