  • Yayın
    Optimization of wastewater treatment systems for growing industrial parks
    (Elsevier B.V., 2023-12-20) Savun Hekimoğlu, Başak; İşler, Zülal; Hekimoğlu, Mustafa; Burak, Selmin; Karlı, Deniz; Yücekaya, Ahmet; Akpınar, Ersin; Ediger, Volkan Ş.
    Wastewater treatment is one of the crucial functions of industrial parks as wastewater from industrial facilities usually contains toxic compounds that can cause damage to the environment. To control their environmental loads, industrial parks make investment decisions for wastewater treatment plants. For this, they need to consider technical and economic factors as well as future growth projections as substantial construction and operational costs of wastewater treatment plants have to be shared by all companies in an industrial park. In this paper, we consider the long-term capacity planning problem for wastewater treatment facilities of a stochastically growing industrial park. By explicitly modeling randomness in the arrival of new tenants and their random wastewater discharges, our model calculates the future mean and variance of wastewater flow in the industrial park. Mean and variance are used in a Mixed Integer Programming Model to optimize wastewater treatment plant selection over a long planning horizon (30 years). By fitting our first model to empirical data from an industrial park in Turkey, we find that considering the variance of wastewater load is critical for long-term planning. Also, we quantify the economic significance of lowering wastewater discharges which can be achieved by water recycling or interplant water exchange.
  • Yayın
    Optimal project duration for resource leveling
    (Elsevier Science BV, 2018-04-16) Atan, Sabri Tankut; Eren, Elif
    Resource leveling is important in project management as resource fluctuations are costly and undesired. Typically, schedules with better resource profiles are obtained by shifting the activities within their float times using the schedule of fixed duration found by Critical Path Method. However, if the project duration can be extended, it is plausible to find a schedule with enhanced resource leveling since a longer duration allows for more float time for all activities. In this work, we relax the assumption of fixed durations in resource leveling formulations and investigate what the minimal project duration for the best leveled schedule should be. We provide mixed-integer linear models for several leveling objectives including the Release and Rehire metric. We show that not all metrics used for leveling under fixed durations may be appropriate when the project duration becomes a decision variable. Optimal solutions from smaller problems are used to find the magnitude of the extension needed and benefits obtained thereby. Since the problem is a NP-hard problem for which exact solutions cannot be obtained for large networks in reasonable time, we provide a greedy heuristic to be used with the Release and Rehire metric. Using an iterative framework, we also test the performance of a state-of-the-art heuristic algorithm from the literature on our problem. Computational experiments indicate that the more the number of resources is increased, the less leveling benefits are gained from extending the project. The optimal project durations and extension benefits can also be significantly different for different metrics.